Published 4 days ago • loading... • Updated 3 days ago
New Generator Adds 1.5 MW to Linden Power Supply in Guyana
Summary by The Rio Times
3 Articles
3 Articles
New Generator Adds 1.5 MW to Linden Power Supply in Guyana
A 1.5 MW generator arrives at Bosai's Linden power house, but peak demand already exceeds capacity. The second engine is not confirmed. The post New Generator Adds 1.5 MW to Linden Power Supply in Guyana appeared first on The Rio Times.
1.5MW generator arrives in Linden to boost power supply
— installation underway, power expected by mid-next week EFFORTS to strengthen Linden’s electricity supply have advanced with the arrival of an additional 1.5-megawatt (MW) portable generating set at Bosai’s power house in Linden. Installation of the unit is currently underway, with technical teams working on the necessary transformer and fuel-line connections. Once those works are […]
Coverage Details
Total News Sources3
Leaning Left0Leaning Right1Center0Last Updated100% Right
Bias Distribution
- 100% of the sources lean Right
100% Right
R 100%
Factuality
To view factuality data please Upgrade to Premium







