Gujarat: 'White Topping Road' in Gandhinagar Completed, Cost of 38 Crores, Life Is 20 Years
2 Articles
2 Articles
Gujarat: 'White Topping Road' in Gandhinagar completed, cost of 38 crores, life is 20 years
White Topping Road. Many roads and bridges have been damaged due to heavy rains in most areas of Gujarat during the monsoon season. Under the guidance of Chief Minister Bhupendra Patel, strict instructions have been given to repair these roads and bridges immediately. Currently, work is going on on a war footing in the entire state. Union Road and Transport Minister Nitin Gadkari had suggested regarding the construction of a white topping road …
Under the guidance of Chief Minister Bhupendra Patel, the work of white topping road in Gandhinagar has been successfully completed at a cost of Rs. 38 crore. The total length of Koba-Adalj Link Road in the capital and the 2.80 km long road from Sargasan to Rakshashakti Circle have now been prepared using the new white topping method. Under the white topping method, a layer of concrete of about 20 cm thickness is laid on the surface of the exist…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium