Get access to our best features
Get access to our best features
Published 2 years ago

Public works: Contaminated soil on Kenilworth reservoir gone by July

Summary by Ground News
The city expects to replace 16,000 cubic metres of contaminated soil with clean dirt atop the Kenilworth Access reservoir by July. Trucks are hauling the material polluted with benzo(a)pyrene from the nearly 60-year-old reservoir to a waste facility in Toronto. A contractor discovered the soil was laced with the coal-burning carcinogen while digging at the underground structure that stores drinking water for Mountain residents.

0 Articles

All
Left
Center
Right
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe
Ground News Article Assistant
Not enough coverage to generate an Article Assistant.

Bias Distribution

  • 100% of the sources lean Left
100% Left
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Sources are mostly out of (0)