Published • loading... • Updated
Proposed Hourglass Wind Energy Centre - Tumbler RidgeLines
Summary by tumblerridgelines.com
1 Articles
1 Articles
Proposed Hourglass Wind Energy Centre - Tumbler RidgeLines
Back when Site C got the go ahead, the government of BC also put a cap on how much power it would purchase from Independent Power Producers (IPPs). While they still purchased power from smaller projects under the Standing Offer Program (SOP), each project was limited to a maximum size of 15 MW. In 2018, the SOP program was temporarily suspended as the province reviewed the process, after calls that power was being purchased at too high a price. …
·Tumbler Ridge, Canada
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium