New bridge over River Trent set to be lifted into place
6 Articles
6 Articles
Nottingham’s new Transforming Cities funded walking and cycling bridge successfully lifted into place – My Nottingham News
The 87metre, 175tonne bridge was lifted into place by a huge crawler crane On Monday 10 November – Nottingham’s brand-new footbridge was lifted into place over the river Trent following months of careful planning. The bridge was lifted into place by a huge CC6800 crawler crane which rose 75metres into the sky. This crane arrived onsite in sections last week and was carefully erected using other cranes. This morning the crane lifted the br…
New images show Waterside Bridge slowly lifted into its River Trent location
Pictures released by Nottingham City Council show the progress of the bridge lift today. The new traffic-free bridge, the first to be built over the river Trent since Clifton Bridge in the 1950s, and its new and enhanced connecting paths will be a key link between the regenerating Trent Basin area with its new homes […]
Giant crane begins dramatic lift of new bridge over Trent
The 278ft-long (85m) Waterside Bridge is being crane-lifted into place and will connect the Trent Basin development near Colwick with Lady Bay in Rushcliffe. The post PICTURES: Giant crane begins dramatic lift of new bridge over Trent appeared first on Gedling Eye.
Coverage Details
Bias Distribution
- 100% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium
